← Tillbaka till sök

Interruption cost survey, calculation of a single value of lost load and interruption cost parameters

ENERGIMARKNADSINSPEKTIONEN

Öppna upphandlingen hos källan (TED)

Köpare
ENERGIMARKNADSINSPEKTIONEN
Plats
ESKILSTUNA · SWE
Värde
2 500 000 SEK
Publicerad
2025-06-05
Sista anbud
2025-08-26
CPV
79311400
Status

Beskrivning

The purpose is to conduct a survey on interruption costs, calculate interruption costs parameters, and calculate and propose a single value of lost load (VOLL). Ei should be able to use the • Interruption cost parameters to calculate the continuity of supply (CoS) incentive in the revenue cap regulation for the next regulatory period, 2028-2031, and • Single VOLL as a parameter in the calculation of the reliability standard (RS). Tenders must be in Swedish or English.

Relaterade upphandlingar