Retrofit CHP Project – Electrical Installation

Stockholm Exergi AB

Köpare
Stockholm Exergi AB
Plats
Stockholm · SWE
Värde
2 000 000 SEK
Publicerad
2021-08-13
Sista anbud
2021-09-09
CPV
45310000
Status
—

Beskrivning

Lifetime of the CHP project. Electrical Installation • Demolition and scrapping of cables, drawers and cabinets, ducting, switchgear, power stations, transformers, lighting, etc. • Delivery and installation of new lighting including switchgear, transformers, power stations, cabling, ducting, etc. • Delivery and installation of new power and control cabling for process and new ducting Time Sceduele • The majority of all work will be performed over a period of 6 months more specific 2023-03-01 through 2023-08-31. • Installation of lighting fixtures, including associated cabling, should be completed by 2023-12-31. • Certain preparatory work will be carried out during the summer / autumn of 2022

Nästa upphandling inom installation av elektriska ledningar och armatur, mejlad till dig

14 dagar gratis, inget kort · sedan från 599 kr/mån · Se priser

Procurdo bevakar nya annonser åt dig och mejlar så fort en upphandling inom installation av elektriska ledningar och armatur publiceras. Bevakningen ligger färdigifylld — du behöver bara skapa kontot.

Relaterade upphandlingar